top of page
Gaillard-Performance-Hall_edited_edited.

Taco Bell

Santee, South Carolina
Simpson Panel System

Simpson Plastering served as the GC for the complete renovation of this restaurant. We replaced the building exterior with the Simpson Panel System. We replaced the tile floors and the ceilings. We gutted the bathrooms and made the new ones ADA accessible.

 

We also installed a new hood and ansul system, all-new kitchen appliances, new electric, a new POS system, a walk-in cooler and new landscaping. Additionally, we poured the asphalt lot, and supplied & installed all interior and exterior signage. We completed the entire project in 11 weeks.

 

Interested in re-imaging your fast food restaurant?

Consider using our panel system, which can be installed in one week regardless of weather conditions. Moreover, your location never needs to be closed during our install — and we’ll work in your drive-thru area during your slowest times, helping you maintain normal sales volumes throughout.

bottom of page